CMAK at construction of 3rd Bridge of Istanbul

Istanbul, the only city located on two continents, have been struggling with the traffic jam problem for a long-time, and to reduce intensity of the problem, the  prestigious 3rd bridge project has been started. CMAK 5t capacity single girder gantry cranes operate at  both abutment construction sites at European and Asian sides of Istanbul.

The 3rd bridge has 1408m span length and 59m width, also it will be one of the largest suspension bridges in the world. The investment cost will be approximately 4.5 million TL and the construction of 3rd bridge is expected to be completed on October, 2015.